Our refurbishment project of the Ben Davis High School bulkheads is complete! Spear Corporation installed these bulkheads almost 30 years ago. Recently they were sent back to Paddock Pool Equipment Company to be inspected, repaired and updated. The process begins by stripping away the old grating and removing the 30-year-old ballast system. Had there been any structural repairs needed, that would have been done. A new upgraded ballast system was installed. The old stainless-steel shell was buffed and polished and brand-new grating was installed before the bulkheads were given one final examination, wrapped and sent back home again to Indiana, looking brand new.