The new Aquatic Center, dubbed FMAC, houses a 25 yard X 50 meter competition pool and is the newest addition to the Fort Mill YMCA at the Complex. The facility features many of Paddock’s top of the line products, including: R300TG Gutter System is complemented with an integral Evacuator® System to ensure the indoor air quality is always at it’s best; Regenerator™ filters keep the water crystal clear; Movable Bulkhead creates a solid, sturdy structure to separate the pool and use as a coaching platform; as well as Main Drains, Starting Platforms, Lifeguard Chairs, Backstroke Posts, and miscellaneous rail goods. The facility is operated by the Upper Palmetto YMCA group and owned by the local municipality, a great combination to ensure health and fitness is available to the community.
The new Aquatic Center, dubbed FMAC, houses a 25 yard X 50 meter competition pool and is the newest addition to the Fort Mill YMCA at the Complex. The facility features many of Paddock’s top of the line products, including: R300TG Gutter System is complemented with an integral Evacuator® System to ensure the indoor air […]
Paddock is proud to be a part of this residential dream pool. This private pool contains two lap lanes, a radius multi-level sun deck, and an adjacent spa, all in the comfort of their own back yard. This pool is equipped with our R300 Gutter System, Paddock Fast Track Starting Blocks, Grab Rails, and Custom Flags. This beautiful outdoor pool was built and designed by WL Watson Pools. It is a custom shotcrete pool that includes a Marcite surface, sand filtration system, Accutab, and AcidRite chemical feeders with a Chemtrol controller, for seamless operation.
Paddock is proud to be a part of this residential dream pool. This private pool contains two lap lanes, a radius multi-level sun deck, and an adjacent spa, all in the comfort of their own back yard. This pool is equipped with our R300 Gutter System, Paddock Fast Track Starting Blocks, Grab Rails, and Custom […]
[video width="1000" height="800" mp4="https://www.paddockindustries.com/wp-content/uploads/2023/05/BenDavisDraft2-3.mp4" autoplay="true"][/video]
Our refurbishment project of the Ben Davis High School bulkheads is complete! Spear Corporation installed these bulkheads almost 30 years ago. Recently they were sent back to Paddock Pool Equipment Company to be inspected, repaired and updated. The process begins by stripping away the old grating and removing the 30-year-old ballast system. Had there been any structural repairs needed, that would have been done. A new upgraded ballast system was installed. The old stainless-steel shell was buffed and polished and brand-new grating was installed before the bulkheads were given one final examination, wrapped and sent back home again to Indiana, looking brand new.
Our refurbishment project of the Ben Davis High School bulkheads is complete! Spear Corporation installed these bulkheads almost 30 years ago. Recently they were sent back to Paddock Pool Equipment Company to be inspected, repaired and updated. The process begins by stripping away the old grating and removing the 30-year-old ballast system. Had there been any structural repairs needed, that would have been done. A new upgraded ballast system was installed. The old stainless-steel shell was buffed and polished and brand-new grating was installed before the bulkheads were given one final examination, wrapped and sent back home again to Indiana, looking brand new.